01Industrial refrigeration·Commissioning

Freeze Dryer Repair and Commissioning

Our engineers repaired and commissioned a freeze dryer used for processing fruit and vegetables. To allow testing and commissioning to go ahead, the team repaired the unit’s existing compressor – the make of which could not be identified – and restored it to working order as a temporary measure.

The system performed well throughout testing. The next stage is to replace the temporary compressor with a Bitzer compressor for dependable, efficient long-term operation.

Project highlights

  • Existing compressor repaired and returned to operation
  • Testing and commissioning completed successfully
  • Replacement with a Bitzer compressor planned as the next stage
Fruit and vegetable freeze dryer with stainless steel drying chamber under a shade canopy
Repaired temporary compressor fitted to the freeze dryer refrigeration unit
Ref-Tas technicians working on the freeze dryer during commissioning
Freeze dryer frame with control cabinet, compressor and vacuum pumps
Inside the freeze dryer electrical control panel
Freeze dryer touchscreen controller showing vacuum and temperature readings during testing

02Compressor overhaul·Chiller

Overhaul of Two BITZER CSH7563-80Y Compact Screw Compressors

We overhauled two BITZER CSH7563-80Y compact screw compressors, returning both to optimal operating condition. The work followed the manufacturer’s recommended maintenance procedures to improve reliability and efficiency and extend the compressors’ service life.

A properly executed overhaul like this reduces the risk of unplanned downtime, supports energy efficiency and helps the chiller deliver consistent performance.

Scope of work

  • Full dismantling and inspection of both compressors
  • New rotor sets, built-in motors and bearings
  • Replacement discharge flanges and discharge flange covers
  • New seals, gaskets and O-rings
  • Cleaning of internal components and oil passages
  • Reassembly with genuine replacement parts
Two overhauled BITZER screw compressors on pallets at the Ref-Tas workshop
Opened rotor housing of a BITZER CSH7563 screw compressor during the overhaul
Screw rotors fitted in the BITZER CSH7563 compressor housing
Two overhauled BITZER CSH7563 compressors wrapped in protective film

03Compressor overhaul·Installation

BITZER Compact Screw Compressor Overhaul

Another Bitzer compact screw compressor fully overhauled by our team. Every critical component was inspected and restored to deliver reliable performance and a longer service life.

With the overhaul complete, the compressor was prepared for installation and commissioning, ready to return to dependable cooling duty.

Project highlights

  • Complete overhaul of a Bitzer compact screw compressor
  • Inspection and restoration of all critical components
  • Prepared for installation and commissioning
Fully overhauled Bitzer compact screw compressor in the workshop
Overhauled Bitzer compressor on a pickup truck arriving at the installation site
Mobile crane and site team at the compressor installation location

04Case study·Failure assessment

BITZER CSH8573-110Y: The Cost of Poor Workmanship

High-value industrial equipment should never end up as scrap because of poor workmanship – yet that is exactly what happened to this Bitzer CSH8573-110Y screw compressor after it was overhauled by personnel without the necessary competence.

The compressor showed several critical errors that have no place in professional compressor servicing. As a result, it could no longer be returned to service and was destined for scrap.

The lesson is clear: expertise, the correct tools and strict adherence to manufacturer standards are essential. Cutting corners on critical equipment does not save money – it multiplies the losses. Always make sure the work is carried out by qualified professionals.

What went wrong

  • Incorrect bearings fitted, compromising performance and reliability
  • Motor rewound and insulated far below acceptable standards
  • Grooved nuts loosened and tightened with a hammer and chisel, causing mechanical damage and misalignment
Poorly rewound motor stator inside the Bitzer CSH8573-110Y compressor
Close-up of substandard winding insulation on the rewound motor stator
Rotor shaft end showing damage around the bearing area
Bearings found fitted in the bearing housing of the Bitzer CSH8573-110Y
Scoring and damage on the compressor bearing housing
Damaged bearing inside the rotor bearing housing
Rotor shaft thread and grooved nut seat showing mechanical damage
Marks and damage on a rotor shaft of the scrapped compressor
Terminal box with discoloured and damaged motor lead insulation

05Compressor overhaul·Industrial cooling

BITZER CSH8593-140Y Overhaul for a Plastic Recycling Plant

Our team completed a full overhaul of a Bitzer CSH8593-140Y compact screw compressor for the central cooling system of one of Nigeria’s leading plastic recycling companies.

The work combined precise mechanical restoration with rigorous testing and quality assurance checks. Installation on site is being carried out by our own well-trained, highly skilled technicians.

Project highlights

  • Full overhaul of a Bitzer CSH8593-140Y compact screw compressor
  • Mechanical restoration, testing and quality assurance
  • Central cooling system for a plastic recycling plant in Nigeria
  • Installation by Ref-Tas technicians
Overhauled Bitzer CSH8593-140Y compact screw compressor ready for dispatch
Rotor bearings inside the Bitzer CSH8593-140Y housing during the overhaul
Male and female screw rotors installed in the CSH8593-140Y rotor housing
Compressor end cover with heavy deposits before cleaning
Compressor end cover after cleaning and preparation for reassembly
Bearing housing with oil residue and deposits before cleaning

06Compressor overhaul·Offshore

BITZER CSH8573-140Y Overhaul for an Offshore Pipe-Laying Barge

We completed a full overhaul of a Bitzer CSH8573-140Y compact screw compressor for the central cooling system of an offshore vessel – one of the harshest operating environments for refrigeration equipment.

As with every overhaul, the work combined precise mechanical restoration with rigorous testing and quality assurance. Our technicians are also responsible for installing and servicing two units on board the client’s offshore pipe-laying barge.

Project highlights

  • Full overhaul of a Bitzer CSH8573-140Y compact screw compressor
  • Central cooling system for an offshore vessel
  • Installation and servicing of two units on board a pipe-laying barge
Fully overhauled Bitzer CSH8573-140Y compressor on a pallet ready for shipment
Bitzer CSH8573-140Y on the workbench with the motor housing removed
Close-up of a roller bearing and housing inside the compressor
Rotor housing with bearings in place before the rotors are fitted
Screw rotors installed in the Bitzer CSH8573-140Y housing

07Compressor overhaul·Service report

BITZER 6F.2 Reciprocating Compressor Overhaul

This Bitzer 6F.2 compressor arrived at our Ref-Tas service centre after the customer reported that it was not operating correctly. Dismantling the unit revealed contaminated oil, a damaged cylinder head pin and foreign particles from a wire-brush head inside the compressor.

Our technicians carried out a complete overhaul, restoring the compressor to a clean, reliable condition ready to return to service.

Findings

  • Contaminated oil throughout the crankcase
  • Damaged pin on the cylinder head marked CR
  • Wire-brush fragments, one lodged between the suction reed and valve plate and stopping the valve from working properly

Work carried out

  • Compressor fully disassembled
  • All components flushed and thoroughly cleaned
  • Damaged parts repaired or replaced as required
  • New gasket kit fitted
  • Unit reassembled and professionally repainted
Overhauled and repainted Bitzer 6F.2 compressor ready for service
Bitzer 6F.2 compressor cylinder heads before the overhaul
Bitzer 6F.2 reciprocating compressor as received at the service centre
Oil sight glass showing dark, contaminated oil in the crankcase
Cylinder head marked CR with its cover removed for inspection
Cylinder head cover plate and pin removed for inspection
Wire-brush bristles found inside the compressor during dismantling
Suction reed valves and valve plate removed from the compressor
Piston crown inside the cylinder bore during the overhaul

08Marine refrigeration·Service & repair

Onboard Cooling System Repairs – Navy Vessel DB Abuja

Our team carried out a full inspection, service and repair of three refrigeration systems on board the Navy vessel DB Abuja: the central cooling system, the chiller room and the freezer room, all running on Bitzer compressors.

All three systems are now operating reliably and efficiently, maintaining the mission-critical cooling and cold storage the vessel depends on.

Scope of work

  • Full nitrogen pressure testing, with all leaks located and sealed
  • Replacement of the components needed for long-term system integrity
  • New Bitzer BSE32 compressor oil
  • All filter driers and pressure gauges replaced
  • Pressure switches tested and faulty units replaced
  • Deep vacuum before refrigerant charging
  • Recharged with R407C (central A/C and vegetable room) and R404A (freezer room)
  • Electrical control panels inspected and corrected, with a new temperature controller and sensor
  • New Bitzer seawater-cooled condenser installed for the freezer room
Bitzer compressor and condenser installed in the refrigeration plant
Refrigeration condensing units in the machinery space on board DB Abuja
Original pressure switches and gauges on one of the vessel refrigeration units
Corroded pipework and Bitzer compressor in the vessel refrigeration plant
Refrigeration plant pipework and components in the machinery space
Bitzer compressor and corroded condenser laid out on the deck plates
New Bitzer seawater-cooled condenser alongside the old condenser and compressor
Adding fresh oil to a Bitzer compressor on board the vessel
Corroded solenoid coil terminals found during the inspection
Cold room temperature controllers showing chiller and freezer room readings

09Marine refrigeration·Compressor replacement

BITZER CSH9571-240Y Compressor Replacement on a Marine Vessel

Our Marine Service Team replaced a faulty Bitzer CSH9571-240Y compressor (made in China) with a German-manufactured Bitzer CSH9573-240Y, improving reliability and long-term performance for the client’s marine operations.

Every stage was handled by our experienced technicians, from diagnostics to commissioning. The system was tested and is running satisfactorily.

Scope of work

  • Factory-fill B 320 SH oil replaced with 30 litres of BSE170, as recommended for R-407C
  • Non-functional oil safety switch identified and corrected during installation
  • Damaged insulation on a power supply cable corrected
  • System flushed with nitrogen and pressure tested
  • Core filter driers replaced
  • System evacuated, charged with refrigerant and fully tested
Ref-Tas technicians guiding the new compressor into the deck hatch
Vessel at the quayside where the compressor replacement took place
Bitzer screw compressor in the vessel refrigeration machinery space
Faulty Bitzer CSH9571-240Y compressor before removal
Nameplate of the faulty Bitzer CSH9571-240Y compressor marked Made in China
Chain hoist rigged to lift the compressor in the machinery space
Compressor rigged with lifting slings for removal
Removed compressor resting on the machinery space floor
Technician preparing the new German-made Bitzer CSH9573-240Y for lifting
New Bitzer compressor lifted by crane over the deck hatch
New compressor being lowered below deck through the hatch
New Bitzer CSH9573-240Y compressor installed in the vessel machinery space

10Compressor overhaul·12-month warranty

BITZER CSH9553-180Y Screw Compressor Overhaul

We carried out a complete overhaul of a BITZER CSH9553-180Y semi-hermetic screw compressor, restoring it to peak performance. After full disassembly and precision inspection, critical components were replaced, and the unit was thoroughly cleaned, realigned and given a protective repaint.

The compressor now operates with renewed efficiency and reliability, and the overhaul is backed by a 12-month warranty.

Scope of work

  • Full disassembly and precision inspection
  • New bearings, seals, piston rod and built-in motor
  • Replacement pressure control valve and gaskets
  • Thorough cleaning and realignment
  • Protective repaint, backed by a 12-month warranty
Overhauled and repainted BITZER CSH9553-180Y screw compressor
BITZER CSH9553-180Y compressor as received, before the overhaul
Motor terminal plate of the BITZER CSH9553-180Y compressor
Close-up of the compressor housing during disassembly
Internal compressor component and gasket face exposed during disassembly
Cleaned rotor and bearing bores of the compressor housing
Original built-in motor stator before replacement
Motor stator inside the compressor motor housing
Replacement motor stator delivered in protective packaging
Genuine replacement parts unpacked for the overhaul
Cleaned rotor housing ready for reassembly
Rotor housing casting after cleaning
Compressor partially reassembled on the workshop bench

Need a compressor overhaul or refrigeration repair?

Speak to the Ref-Tas team about your compressor, chiller or cooling system.